Claims: Building and Property
| Immediately |
| |
Notify: |
- Congregation Financial Officer
- Mission Center Financial Officer
- Risk Management Services 1-800-825-2806, ext. 1493; after
hours, holidays, and weekends use emergency cell (816) 853-0012
|
|
|
Minimize damage by taking the following steps: |
- Protect the building by boarding up or covering up as much
as possible the damaged part or removing water, wet carpet and
insulation (mold can begin to form very quickly). Try to isolate
the undamaged part of the structure to minimize loss. If needed,
hire an outside contractor to accomplish this task. Call Risk
Management Services for
assistance in connecting to Crawford’s Water / Fire&Smoke
Mitigation services.
- Turn off utilities if they could cause additional loss.
- If the loss occurs in winter and the building is open to the
elements, turn off water to prevent pipes from freezing and
drain boilers, commodes, water coolers, and other fixtures.
- Take all appropriate measures to ensure that the facility
and surrounding areas are safe for anyone who might be on the
property. For example: Post signs warning of dangerous
buildings. Erect barricades so nobody will enter an unsafe area.
If a chimney or part of a structure is left standing after a
loss, pull down these structures to ensure that the structures
will not fall, injuring someone or other person’s property.
- Remove moveable property from location that might be damaged
by elements, loss of heat/electricity, or possible theft.
Examples: food in freezer (if appropriate), organ, computers,
copiers, or sound system. A storage facility may be rented for
this property.
- If property contents not owned by the church are located in
or on church property, notify the owners that there has been a
loss and ask them to take appropriate steps to protect their
property. Risk Management Services will work directly with the
owner concerning replacing or repairing their property.
- Take pictures and provide supporting documentation.
- If applicable, obtain a police report and forward to Risk
Management Services.
- Make note of preventive steps to be
considered later.
|
| |
Seek out city, county, state, and national
authorities concerning the property and how it is to be
protected or disposed of. Begin the dialogue with these agencies
immediately to ensure a good working relationship throughout the
possible rebuilding or demolition of the building/property. |
| |
Take an inventory of contents that have been
damaged or destroyed. |
| |
|
|
Pre-Contract |
- Convene the building committee to address or oversee the
rebuilding or demolition of the structure. It may be advisable
to appoint new committee members with building or construction
backgrounds.
- Assist Risk Management Services in assessing damage. Work
with the adjuster if one is assigned. Usually Crawford & Co will
be called in for claims that are rather complex and/or over
$10,000.
- The congregational financial officer is responsible for the
collection of invoices and charges associated with the
repair/demolition. These invoices should include but not be
limited to rent for storage facilities, rent for temporary
meeting facility, all repair costs, all demolition costs,
disposal costs, license charges, or engineering/architectural
charges. Payment for charges will only be made with a submitted
invoice. (Payment/reimbursement will be less the $750.00 deductible).
- Evaluate the program goals and objectives of the
congregation to ascertain that the plan is in harmony with the
action for the demolition or rebuilding of the property.
- Keep the Mission Center president and financial officer, and
Risk Management Services apprised of actions and desires of the
committee and congregation. Provide updates concerning status.
|
|
Bids and Contract Preparation |
-
Before retaining an engineer, architect or
contractor discuss options with Risk Management Services.
(Crawford Contractor Connections may be the best approach.)
-
Engineers, architects and contractors should
research any pertinent change in building codes, life safety
codes, and kitchen/health codes. The church will abide by all
city, county, state, and national codes.
-
The church cannot serve as its own general
contractor.
-
Bid specifications should be submitted to
potential construction companies. These companies should be of
sound financial strength, insured and provide references. The
selected company will be asked to sign a contract prepared by
the Legal staff for the work that is to be performed.
-
Each bidding company will provide the church
with all the information needed to complete the contract,
including but not limited to the following: A valid certificate
of insurance evidencing the insurance coverage of the
contractor. The church will be named an additional insured on
the certificate of insurance. The construction company
will provide the church with a performance, labor and material
bond in the amount of the contract (if in excess of $50,000).
-
The insurance coverage will only pay to repair
or replace with like kind and quality of building and contents,
unless an upgrade is required by code, statute, or law.
Requested upgrades to the building or contents, beyond what was
damaged, will be paid by the jurisdiction.
-
Legal staff will insure that the construction
company has provided the: contractor’s bid, signed contract,
bond (if required) and certificate of insurance.
-
Advanced funds may be made available to address
immediate repairs and charges. A schedule for submitting
invoices will be spelled out in the contract.
|
|
During Construction |
- After signing the contract for reconstruction, the building
committee representative should follow the progress of the work
by being on site as much as possible.
- The building committee representative will keep the Mission
Center president and financial officer and Risk Management
Services apprised of the progress of the work and notify them
when the work is completed.
- A Partial Lien Waiver
must be completed and submitted prior to making any partial
payments.
|
|
Post- Construction |
- Final approval should not be given until all work has been
completed to the satisfaction of the jurisdictional leadership
as specified by the contract.
- A Final Lien Waiver
must be completed and submitted prior to payment.
- A W-9 should be faxed to Risk Management Services
(816-521-3035) for each contractor
or supplier that is to be paid by the World Church.
- A deductible payment of $750.00 is due to Risk Management
Services before the claim is settled.
- Invoices for payment will be submitted to Risk Management
Services for approval and payment. Payments may be made locally
and then reimbursed.
|
|
Preventive Steps |
- Perform an annual property inventory listing of the building
and contents or an annual videotape of the building and contents
should be made or compiled. This listing or videotape should be
stored at the congregational financial officer’s residence away
from the church or facility.
- Install alarm systems for burglary, fire and smoke.
- Provide more exterior lighting
- Provide adequate water drainage away from building
- Keep a slow drip of water in winter to prevent pipe freeze
- Keep water pipes warm during winter. Or if the building is
open to the elements, turn off water to prevent pipes from
freezing and drain boilers, commodes, water coolers, and other
fixtures.
- Install check valves in all floor drains to prevent sewer
backup.
- Deposit offerings and other funds as soon as possible in the
bank—they should NOT be kept at the church.
- Use mulch instead of rock for the building landscaping.
- Place air conditioning units on the roof or in cages.
- Repair cracks in sidewalks
|
The World Church is available to assist the building committee and
congregation.
Do not hesitate to call Risk Management Services. |
|
|
|
|